Interface: Level 2 Cities Traffic Ops Center - San Diego Maintenance of Roadway Equipment

Level 2 Cities Traffic Ops Center to San Diego Maintenance of Roadway Equipment Interface Diagram

Information Flow Definitions

current infrastructure restrictions  (Planned)  

Restrictions levied on transportation asset usage based on infrastructure design, surveys, tests, or analyses. This includes standard facility design height, width, and weight restrictions, special restrictions such as spring weight restrictions, and temporary facility restrictions that are imposed during maintenance and construction.

Infrastructure Restriction  (Existing)  

Restrictions levied on transportation asset usage based on infrastructure design, surveys, tests, or analyses. This includes standard facility design height, width, and weight restrictions, special restrictions such as spring weight restrictions, and temp

maint and constr work plans  (Planned)  

Future construction and maintenance work schedules and activities including anticipated closures with anticipated impact to the roadway, alternate routes, anticipated delays, closure times, and durations.

work plan feedback  (Planned)  

Comments and suggested changes to proposed construction and maintenance work schedules and activities. This information influences work plan schedules so that they minimize impact to other system operations and the overall transportation system.