Interface: Level 1 Cities Public Works TMC - Metrolink Dispatch

Level 1 Cities Public Works TMC to Metrolink Dispatch Interface Diagram

Information Flow Definitions

current infrastructure restrictions  (Planned)  

Restrictions levied on transportation asset usage based on infrastructure design, surveys, tests, or analyses. This includes standard facility design height, width, and weight restrictions, special restrictions such as spring weight restrictions, and temporary facility restrictions that are imposed during maintenance and construction.

emergency transit schedule information  (Planned)  

Information on transit schedule and service changes that adapt the service to better meet needs of responders and the general public in an emergency situation, including special service schedules supporting evacuation.

maint and constr work plans  (Planned)  

Future construction and maintenance work schedules and activities including anticipated closures with anticipated impact to the roadway, alternate routes, anticipated delays, closure times, and durations.

railroad schedules  (Planned)  

Train schedules, maintenance schedules, and other information from the railroad that supports forecast of HRI closures.

road network conditions  (Planned)  

Current and forecasted traffic information, road and weather conditions, and other road network status. Either raw data, processed data, or some combination of both may be provided by this flow. Information on diversions and alternate routes, closures, and special traffic restrictions (lane/shoulder use, weight restrictions, width restrictions, HOV requirements) in effect is included.

work plan feedback  (Planned)  

Comments and suggested changes to proposed construction and maintenance work schedules and activities. This information influences work plan schedules so that they minimize impact to other system operations and the overall transportation system.